Pipeline Coatings Inspector: Case Study

Objective

This training unit is an overview of a specialist field joint coating on a wet thermally insulated pipeline on a pipe laying J-Lay barge during the pipe laying operations over water.

The case study has been taken from a real live project.


Objective only

Limited content shown. Log in or request permission to view additional content including slideshows, animations and videos